精品国产精品国产自制久久_九色综合九色综合色鬼r_天天看片天天a动漫_亚洲中文无码男人的天堂

首頁(yè) 產(chǎn)品展示>John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動(dòng)機(jī)缸套突出量的測(cè)量方法與標(biāo)準(zhǔn)值參數(shù)

John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動(dòng)機(jī)缸套突出量的測(cè)量方法與標(biāo)準(zhǔn)值參數(shù)

我們是專業(yè)的John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動(dòng)機(jī)缸套突出量的測(cè)量方法與標(biāo)準(zhǔn)值參數(shù)供應(yīng)服務(wù)商.我們可提供John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動(dòng)機(jī)缸套突出量的測(cè)量方法與標(biāo)準(zhǔn)值參數(shù)銷售維修保養(yǎng)零配件服務(wù).John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動(dòng)機(jī)缸套突出量的測(cè)量方法與標(biāo)準(zhǔn)值參數(shù)想要更多的類型,請(qǐng)現(xiàn)在聯(lián)系湖南英珀威機(jī)械有限公司!
產(chǎn)品咨詢

詳細(xì)描述

John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動(dòng)機(jī)缸套突出量的測(cè)量方法與標(biāo)準(zhǔn)值參數(shù)

1. Secure liners using cap screws and flat washers. Flatwashers should be at least 3.18 mm (1/8 in.) thick.Tighten cap screws to 68 N•m (50 lb-ft).

2. Using JDG451 or KJD10123 Gauge (B) and D17526CIor D17527CI Dial Indicator (C), measure liner height

(A) at 1, 5, 7, and 11 o’clock positions as viewed fromflywheel end of engine. Record all measurements bycylinder number.

Specification

Cylinder Liner—Height aboveBlock 0.030—0.100 mm(0.001—0.004 in.)

Maximum Permissible HeightDifference at Nearest Point ofTwo Adjacent Liners, or Within a

Single Liner................................................................. 0.05 mm (0.002 in.)

IMPORTANT: ONE LINER SHIM ONLY may beinstalled under each liner flange.

3. Remove and shim, or replace, any liner that does notmeet height specifications. (See REMOVE CYLINDERLINERS in Group 030.)

NOTE: Two sizes of shims are available: 0.05 mm (0.002in.) and 0.10 mm (0.004 in.).

氣缸蓋的安裝

1. Dip fuel supply pump push rod (A) (if equipped) inclean engine oil and carefully install in cylinder blockbefore installing cylinder head.

A—Fuel Supply Pump Push Rod

IMPORTANT: The O-ring seals in head gasket can bedamaged if head is repositioned whileresting on engine block. Use guidestuds to position cylinder head onblock.

2. Install two guide studs (B) in cylinder block at locatingholes.

IMPORTANT: ALWAYS thoroughly inspect cylinderhead gasket for possible manufacturingimperfections. Return any gasket thatdoes not pass inspection.

3. Place new head gasket on cylinder block. Do not usesealant; install dry.

4. Position cylinder head over guide studs and lower ontocylinder block.

5. Dip entire cap screw in clean engine oil. Removeexcess oil from screw.

6. Remove guide studs. Install flanged-head cylinderhead cap screws.

7. Tighten all cap screws to specified torques (insequence shown, beginning with No. 1), followingsteps 1—4 below. Then, torque-turn cap screwsfollowing procedure on next page.

Cylinder Head Cap Screws—Specification

Step 1—Initial—Torque ................................................. 100 N•m (75 lb-ft)

Step 2—Second—Torque ........................................... 150 N•m (110 lb-ft)

Step 3—Verify (After 5Minutes)—Torque........................................................ 150 N•m (110 lb-ft)

Step 4—Final—Torque-Turn Tighten each screw an additional60° ± 10°. (See TORQUE-TURNMETHOD FOR PROPERTORQUE in this group.)

Retorque of cylinder head cap screws after enginebreak-in is not required when using the recommendedtorque procedure along with flanged-head cap screw.

免費(fèi)熱線
400-082-9096?
整機(jī)銷售
0731-84424871? 18374999699
售后維修
0731-84424872? 15580888444
配件銷售
0731-84424873? 18274802060
手機(jī)端
微信公眾號(hào)